Living list of things to complete for the final project
Italics = Something to Potentially do
Bold = Important
Beginning Area:
- Fix / Tune Lighting to be similar to the facility in Black Mesa
- Set Dress Inaccessible Hallway
- Fix or replace Textures of Ceiling Tiles on Corner Bends
- Fix / Add Beginning Context Blurb
- **Set Dressing ****(Props, Overlays, Textures)
Maintenance Hall:
- Replace Physics Puzzle in Final Room
- Fix Logic and Lighting for Ending Sequence
- Replace Vent Textures with better ones
- Kill some lighting in Hallway after turning on Elevator Power to add finishing ambience before end
- Fix Valve not being centered in Valve Holder
- Set Dressing (Overlays Primarily)